做爱动态图

Hello, welcome to Zhengzhou Tate Heavy Machinery Co., Ltd.
Years of experience in building machinery sales and service

Concrete mixing station supplier

Fifteen billion three hundred and forty-six million five hundred and seventy-eight thousand six hundred and sixty-six

Contact us

Zhengzhou Wei TSE Heavy Industry Machinery Co., Ltd.


Mobile phone: Fifteen billion three hundred and forty-six million five hundred and seventy-eight thousand six hundred and sixty-six

Contact: Zhang Wei

Website: ipad3-rumors.com

Industry news

Industry news

Current location: Home Page > News Center > Industry news

120 concrete demolition steps of concrete mixing station detailed explanation

Source: Zhengzhou Tate heavy machinery release time: 2017-10-26 13:34:18 Click:

120 the concrete mixing plant is a large commercial mixing machinery. After the completion of the construction, it is not recommended to remove the movement frequently. The time consuming and energy consuming will not be mentioned. Improper installation and demolition may also affect the subsequent use of the equipment. In this paper, 120 concrete mixing station specific demolition steps.
1. The outer color plate is removed, and the outer color plates and skeletons are removed from top to bottom. The removal of the color plate is avoided during the demolition process. The self tapping screws and rivets are dismantled by hanging basket and electric wrench, and are removed by crane, and the cement and fly ash pipeline is removed.
2, dismantle concrete batching machine and screw conveyor;
3, four screw conveyor dismantling;
4. Demolition of cement tank and fly ash tank.
5. Use a crane to remove the tank top dust collector and the tank top conveying pipe, and the top of the tank is connected to the aisle board.
6. Use crane to remove cement tanks and fly ash tanks and hang them on the ground support.
7. Use the crane to dismantle four tank supports separately and dismantle them to the ground.
8, dismantling hopper, aggregate weighing device, powder weighing device, water weighing device, admixture weighing device, compressed air system device, using crane to dismantle;
9, dismantle the concrete mixer and use the crane to remove it.
10, remove the hopper to remove the mixing platform and remove the lower column of the main mixer. During the dismantling process, the equipment should be strictly registered in accordance with the order, and the equipment and part numbers should be registered and labeled before the equipment is dismantled. In the process of equipment dismantling, it is necessary to dismantle the equipment with reasonable work tools, strictly prohibit the collision and damage of the equipment, and do not move the parts of electric welding and gas welding as far as possible, so as to ensure the integrity and completeness of the equipment.